- Other Boards[1]
- Other Heat Insulation Materials[1]
- HVAC Systems & Parts[10]
- Metal Building Materials[7]
- Cable Trays[10]
- Other Fasteners[2]
- Other Hardware[1]
- Belt Making Machinery[1]
- Building Material Making Machinery Parts[1]
- Construction Machinery Parts[1]
- Metal Cutting Machinery[3]
- Metal Straightening Machinery[10]
- Other Metal Processing Machinery[10]
- Other Machinery[1]
- Packaging Machinery[2]
- Other Steel Profiles[1]
- Steel Channels[6]
- Steel Sheets[10]
- Steel Strips[4]
High Speed&Precision CTL
CUT TO LENGTH LINE, NEW Patents:1.LOSSLESS TENSION device 2.LOSSLESS LEVELING device 3.Highest Quality 4.Economical and Pratical
High Speed&Precision CTL
The Line is mainly used as uncoiling, straightening ,gauging, cross-cutting to length and stacking work with high processing speed and precision.
1. Our superiority:
1).Newest patents of LOSSLESS TENSION device and LOSSLESS LEVELING device for slitting&shearing line
2).Best service
3).Highest quality
4).Economical and Practical
2.Specification of the line:
Coil material: Common cold/hot rolled, Galvanized, Per-painted steel coil, electrolytic metal, etc.
--Coil thickness: Customized design
--Coil width: Customized design
--Coil weight: 40 MT (Max)
--Line Speed: 100 m/min (Max)
--Tolerance of width: 0.05 mm
3.The main parts of the line :coil station, coil car, uncoiler, pinch machine, straightener, CNC cut to length, shearer, conveyor, stacker, dump car, hydraulic system, pneumatic system, Lubricate system, Electrical system etc.Excellent performance of cross-cutting the various steel coil.
Coil material: Common cold/hot rolled plate/coil, Galvanized, Per-painted steel coil, electrolytic metal etc.
We offer customized design according to your specific requirements with best cost-effective ratio.
General Contract Clauses
1. Quotation: Our Best FOB price Guangzhou port with our highest quality products and services.
2. Products characteristics:
High Speed;High Precision;High Quality with High Standard;Long time using lifetime; Semi- Full-Automatic;Practical and Economical…More than your paying.
3. Delivery time:
120 days since 45% deposit from the buyer.
4. Terms of payment:
45% paid by T/T as deposit, 55% paid by T/T before Shipment or checking the quality in seller’s factory.
5.Other clauses can be discussed by two of us.